In this section
- 4.1 Purpose and decisions supported
- 4.2 Separate the concepts before drawing
- 4.3 Establish the modelling boundary and inputs
- 4.4 Build and name the capability model
- 4.5 Create a capability register with explicit ownership
- 4.6 Define the value stream as a stakeholder progression
- 4.7 Map capabilities to stages and outcomes
- 4.8 Describe the handoff contract
- 4.9 Model exceptions and assisted paths
- 4.10 Assess ability using evidence, not decorative scores
- 4.11 Compare improvement options and sequence dependencies
- 4.12 Translate into engineering without equating models
- 4.13 Validate with participants and control changes
- 4.14 Expected artifacts and review gate
- 4.15 Verification checklist and next section
4.1 Purpose and decisions supported
A capability model describes what an institution needs to be able to do. A value stream explains how those abilities combine to produce a result for a stakeholder. Together, they connect the purpose and outcomes of Section 03 to responsibilities and investment decisions. They do not prescribe an application, department structure or technology stack.
This section supports decisions about missing abilities, duplicated responsibility, fragile handoffs and priorities for improvement. The first question is not which platform to buy. It is whether the institution can reliably perform the work required by its mandate, including exceptions, correction and continuity.
The chapter proposes a modelling method and a fictional worked example. No real institution has adopted the maps, accepted ownership or passed the checks described here. Adoption requires institutional review; publication remains an editorial draft.
4.2 Separate the concepts before drawing
Different concepts answer different questions. Mixing them produces attractive diagrams that cannot guide a decision. A department may exercise several capabilities, a capability may support several services, and an application may implement parts of many capabilities.
| Concept | Question answered | Example within the fictional scope |
|---|---|---|
| Outcome | What useful change is experienced? | A requester understands the authoritative state and next action |
| Capability | What ability must exist? | Request status communication |
| Value stream | How does value develop across institutional boundaries? | Obtain an accountable decision and fulfilment of a request |
| Process | How is particular work performed? | Review a submitted request and record a decision |
| Service | What defined interaction or offering is provided? | Operational request service |
| Organization role | Who holds authority or performs work? | Departmental decision owner |
| Information | What meaning and record must be maintained? | Request identity, version and decision history |
| Application or platform | What technical means support the work? | Request API, database or notification mechanism |
The terms follow a distinction also present in published business architecture material from OMG and TM Forum: capabilities describe institutional abilities, while value streams connect activities and capabilities to stakeholder value. ZAF uses its own scoped examples and identifiers; it does not claim certification or conformance to those frameworks.
A capability called “PostgreSQL” or “Finance Department” fails this distinction. PostgreSQL is a technology; Finance is an organizational unit. “Financial authorization” describes an ability that can remain meaningful when either the technology or organization changes.
4.3 Establish the modelling boundary and inputs
Begin with the mandate in Section 01, the context and concern registers in Section 02, and the outcome register and measurement contracts in Section 03. Record the versions actually used. An unapproved proposed outcome is an input for discussion, not authority to commit the institution.
The fictional institution has headquarters, six regional offices and a small engineering team. The assessment remains limited to one operational request type and one candidate pilot office. Submission, departmental review, finance approval, fulfilment and reconciliation form the assumed journey to investigate. No timing, volume or maturity baseline has been measured.
Define the trigger, beneficiary, terminal states, participating actors, excluded request types and external dependencies before decomposition. The map should cover the selected service sufficiently to expose important handoffs; it must not imply that a pilot view is a complete enterprise capability model.
All CAP, VS, STG, H and DEC identifiers below belong to ZAF-I-04. Cross-section outcome references retain their full prefix, for example ZAF-I-03-OUT-01. Reusing a number in another chapter does not make it the same record.
4.4 Build and name the capability model
Name capabilities in stable business language, usually a noun phrase expressing an ability: request intake, decision management, fulfilment coordination. Define each by purpose, scope and observable ability rather than a list of screens or job titles.
Start broad enough to compare responsibility, then decompose only where ownership, requirements or investment decisions require it. A parent capability groups related abilities; its children are more specific abilities, not arbitrary phases or a list of purchased products.
For a candidate parent “Operational request management,” useful children might include intake, decision control and fulfilment coordination. A separate report describing the same ability is not automatically another capability. Use a shared glossary to resolve synonyms, overlaps and genuinely different meanings.
The proposed capability map below groups six service abilities and two supporting abilities. Grouping does not establish departments, software deployment boundaries or a microservices design.
A capability may be performed manually, by a partner, by software or by a combination. Record the realization separately. The capability description should survive a change from a spreadsheet to an application without needing to be renamed after the new tool.
4.5 Create a capability register with explicit ownership
A capability owner is accountable for the ability, its intended performance and improvement decisions. Process participants execute work; data owners govern meaning and permitted use; technical owners operate supporting systems. These are related responsibilities, not interchangeable titles.
| ID and proposed capability | Ability within this scope | Accountable role to confirm | Evidence required |
|---|---|---|---|
| CAP-01 · Request intake | Distinguish local preparation, submission and institutional receipt | Service owner | Receipt examples and duplicate-submission scenarios |
| CAP-02 · Decision control | Record authorized decisions against the content reviewed | Departmental decision owner; finance retains financial authority | Authority rules and amendment/approval histories |
| CAP-03 · Fulfilment coordination | Carry out only the approved request version and track completion | Fulfilment owner | Execution records and exception paths |
| CAP-04 · Reconciliation and reporting | Explain status and totals for an agreed population and cut-off | Information owner; finance approves financial interpretation | Source-to-report trace and correction rules |
| CAP-05 · Status communication | Make authoritative state and next action understandable | Service owner | Observed requester tasks and assistance arrangements |
| CAP-06 · Correction management | Correct or challenge work without erasing original decisions | Service owner within applicable policy authority | Version history and correction/decision scenarios |
| CAP-07 · Continuity management | Maintain or recover the selected service through interruption | Operations owner with the service owner | Recovery exercises and agreed operating procedures |
| CAP-08 · Access and authority management | Grant, review and remove permitted actions for identified roles | Institutionally designated access owner | Role decisions, review records and revocation checks |
These are proposed roles, not confirmed appointments. CAP-02 does not give a department the power to override financial authorization. Its record should distinguish the accountable coordination role from the separate authorities whose decisions are required.
If accountability is disputed, record the gap and its escalation owner. Do not assign all unresolved business capabilities to IT. Section 05 will develop the operating model; Section 06 will examine domain ownership in greater depth.
4.6 Define the value stream as a stakeholder progression
ZAF-I-04-VS-01 is “Obtain an accountable operational request outcome.” Its beneficiary is the requester of the selected service. Its trigger is an intention to submit a request; its endings include fulfilled, rejected or withdrawn work with an authoritative state. Fulfilment is therefore one possible outcome, not the definition of every legitimate completion.
Describe stages by the value established at their exit. A stage is more than an activity label. “Send email” names an action; “Request acknowledged” describes a useful condition that the next participant and requester can rely on.
| Stage | Value established at exit | Main actors | Important alternative |
|---|---|---|---|
| STG-01 · Establish the request | The institution has acknowledged an identifiable request, or the user knows it remains a draft | Requester and receiving service | Interrupted or duplicate submission |
| STG-02 · Establish the decision | An authorized disposition refers to a known version and a next action | Department and finance authorities | Correction, rejection or withdrawal |
| STG-03 · Establish fulfilment | Execution refers to approved content and its completion or exception is recorded | Fulfilment team and service owner | Partial or failed fulfilment |
| STG-04 · Establish the reconciled record | Outcome and reporting population can be explained at an agreed cut-off | Information owner and finance users | Late record or subsequent correction |
This is a stakeholder value progression, not a detailed executable workflow. A refusal may terminate at STG-02 with its own reporting obligations; it does not need to be forced through fulfilment. Reporting and status communication can occur throughout the journey, not only at its last stage.
4.7 Map capabilities to stages and outcomes
A capability can support several stages. A stage usually needs several capabilities, including people, information and operating practices. A mapping entry means there is a contribution to examine; it does not prove that the capability is effective.
| Stage | Capabilities exercised | Proposed outcome connection | Verification focus |
|---|---|---|---|
| STG-01 | CAP-01, CAP-05, CAP-07, CAP-08 | ZAF-I-03-OUT-01 and OUT-03 | Distinguish pending work from receipt under interruption and retry |
| STG-02 | CAP-02, CAP-05, CAP-06, CAP-08 | ZAF-I-03-OUT-02 | Identify reviewed content, authority and next action after amendment |
| STG-03 | CAP-02, CAP-03, CAP-05, CAP-07 | ZAF-I-03-OUT-02 and OUT-03 | Reject execution against a superseded or absent approval |
| STG-04 | CAP-04, CAP-05, CAP-06, CAP-08 | ZAF-I-03-OUT-04 | Reproduce population, cut-off, source lineage and corrections |
All abbreviated OUT references in this table are scoped to ZAF-I-03. The table expresses proposed dependencies. Use its links to find gaps: if no capability can establish receipt, a polished requester interface cannot establish institutional acceptance.
Maintain the mapping as a register as well as a diagram. Each material relationship should state why it exists, which evidence supports it and what observation could refute the proposed contribution. Do not add every capability to every stage simply to make the map look comprehensive.
4.8 Describe the handoff contract
A capability map alone does not explain how responsibility changes hands. At every significant boundary, define the receiving responsibility, information meaning, acceptance condition and exception route. The transport may be manual or technical; an email delivered is not proof that work was accepted.
| Handoff | Information and authority transferred | Receiving acceptance | Failure or ambiguity |
|---|---|---|---|
| H-01 · Intake to review | Request identity, submitted content version, receipt and responsible queue | Reviewer can identify the request, version and required action | Preserve pending state; investigate duplicate or missing receipt |
| H-02 · Decision to fulfilment | Authorized disposition, reviewed version, scope of approval and constraints | Executor can verify that execution matches valid approval | Hold execution and refer the mismatch to the decision authority |
| H-03 · Fulfilment to reconciliation | Execution reference, completion/exception state and relevant source records | Reporting owner can place the record in the agreed population | Record unresolved discrepancy; do not silently rewrite totals |
For each handoff, record who acknowledges acceptance, what happens if acknowledgement is missing, and how a disputed state is resolved. The institution sets response and escalation expectations after evidence review; this draft invents no deadline or service commitment.
These contracts describe business meaning. Book II will later determine suitable integration and consistency mechanisms. They do not imply that every handoff must use an API, event bus or distributed transaction.
4.9 Model exceptions and assisted paths
The happy path is insufficient. Test correction before approval, amendment after approval, rejection, requester withdrawal, incomplete fulfilment, duplicate submission and loss of connectivity. Ask whether each path preserves authority and understandable state.
A local draft may resume after an interruption without becoming institutionally received. If the user switches to an assisted channel, define how the institution identifies the same request and avoids conflicting records. Do not assume staff can solve the problem by keeping an unofficial spreadsheet.
After approval, correction may require a new version and decision. Preserve the original approved record. Whether the old approval remains valid for any part of the work is a policy and service decision, not something an application developer should infer.
For rejection or challenge, record the authorized next route and disclosure boundary. There is no universal claim here about legal entitlement. The policy owner confirms what applies to this institution and request type. Link unresolved paths back to the concern register rather than hiding them in diagram footnotes.
4.10 Assess ability using evidence, not decorative scores
A capability assessment should distinguish importance, demonstrated ability, operating fragility and evidence confidence. A critical capability may have little evidence; a well-documented one may still deliver poor outcomes. Combining these dimensions into a single red/amber/green score can obscure the decision.
| Assessment dimension | Question | Acceptable evidence or explicit unknown |
|---|---|---|
| Outcome relevance | Which approved or proposed outcome depends on this ability? | Stage/outcome mapping with rationale |
| Demonstrated ability | Can the defined work be performed, including exceptions? | Observed case walkthrough or exercised scenario |
| Ownership | Has a role accepted accountability and authority boundaries? | Confirmed owner and unresolved conflicts |
| Continuity | Can the ability survive absence, interruption or recovery? | Exercise records and dependency analysis |
| Evidence confidence | Is the sample recent, relevant and sufficiently representative? | Source, date, coverage and limitations |
In the example, CAP-04 has unverified reporting definitions. That supports “definition unresolved,” not a fabricated maturity level. CAP-07 remains “not demonstrated” until the relevant exercise has been performed; a backup configuration screenshot is not a recovery result.
If an institution adopts scoring later, document scale definitions, assessors, evidence and treatment of unknowns. Never translate missing evidence into a confident low score or imply an assessment has happened because the template contains colored cells.
4.11 Compare improvement options and sequence dependencies
Use the capability-stage map to identify the smallest change that could improve an intended outcome. Compare process clarification, staffing or training, information agreements and technical changes. A platform purchase is only one candidate intervention.
| Candidate change | Capability dependency | Decision before implementation | Proposed evidence |
|---|---|---|---|
| Define receipt states and assistance | CAP-01 and CAP-05 | Service owner agrees what constitutes receipt | Requester tasks including interrupted submission |
| Bind approval to reviewed content | CAP-02 and CAP-03 | Decision authorities agree amendment consequences | Stale-approval and execution-mismatch scenarios |
| Agree a reporting contract | CAP-04 and CAP-06 | Information and finance owners agree population and revision rules | Reconcile the same selected records and explain differences |
| Exercise continuity | CAP-07 with service capabilities | Service owner agrees recovery priorities and reconciliation responsibility | Authorized restore/resumption exercise with recorded limits |
These are alternatives or dependent changes, not an approved delivery backlog. A technical implementation of version-bound approval depends on an agreed authority rule. A dashboard depends on a reporting definition. Sequence decisions before tools that encode unresolved meaning.
Record proposed decisions ZAF-I-04-DEC-01 through DEC-04 against these four rows respectively. Each needs an owner, alternatives, rationale, evidence gaps and revisit condition. Their illustrative presence is not evidence of institutional approval.
4.12 Translate into engineering without equating models
A business capability is not automatically a bounded context, microservice, repository or team. One software component may support several capabilities; one capability may require multiple systems and manual work. Decomposition requires further analysis of meaning, authority, consistency and change.
For example, CAP-02 and CAP-03 could be supported by one application or separate services. This chapter does not settle that choice. Ask which invariants must hold, how decisions are versioned, what failures are tolerable and who can operate the result before drawing deployment boundaries.
Likewise, shared status communication does not automatically justify an enterprise-wide platform. Compare repeated needs, semantic differences, governance and operating cost. Standardize common contracts where useful; preserve legitimate domain differences where a shared model would distort authority or service meaning.
The handoff to Book II includes capability definitions, ownership questions, information contracts, value-stage contributions and verification scenarios. Infrastructure and Kubernetes adoption remain downstream choices, conditional on actual requirements.
4.13 Validate with participants and control changes
Walk one ordinary case and several material exceptions through the map with the requester representative, service owner, decision authority, information owner and operations representative. Ask each participant to explain the state they receive and the responsibility they accept. A meeting held is not a validated model.
Record conflicting interpretations, missing capabilities and unsupported transitions. Preserve disagreement rather than resolving it through diagram aesthetics. The sponsor accepts the scoped model only after the required owners have reviewed their responsibilities and material unresolved issues are explicitly handled.
Version the capability register and stage map together with their dependencies. A policy change, new request type, organizational reassignment or altered reporting definition can invalidate a mapping even when the software is unchanged.
Keep identifiers stable when names change without changing meaning. When scope splits or merges, retain predecessor references and explain migration of ownership and evidence. Do not recycle a retired ID for an unrelated capability.
4.14 Expected artifacts and review gate
The seven artifacts below are proposed templates for adopting institutions, not completed client deliverables. Record actual authors, owners, versions, sources, limitations and decisions when used.
| Artifact | Minimum content | Gate question |
|---|---|---|
| ZAF-I-04-A01 · Scope and glossary | Trigger, beneficiary, boundary, terminology, exclusions and input versions | Are participants modelling the same service? |
| ZAF-I-04-A02 · Capability register and map | Definitions, decomposition, owners, realizations and stable IDs | Are abilities distinct from tools and departments? |
| ZAF-I-04-A03 · Value stream record | Stages, exit value, actors, endings and exceptions | Does the model explain value across boundaries? |
| ZAF-I-04-A04 · Contribution mapping | Capability-stage-outcome links and supporting rationale | Can each material dependency be explained? |
| ZAF-I-04-A05 · Handoff contracts | Information, authority, acceptance, exceptions and escalation | Can responsibility pass without ambiguity? |
| ZAF-I-04-A06 · Evidence and options assessment | Observations, unknowns, dependencies, alternatives and priorities | Does evidence justify the proposed improvement? |
| ZAF-I-04-A07 · Validation and change record | Scenarios, participants, disagreements, owner decisions and revisions | Is the scoped model accepted with visible limitations? |
Review the model for institutional use separately from accepting a technical design. An agreed capability map does not authorize production access, procurement or deployment. Editorial acceptance of this ZAF section is also separate; it remains a working draft.
4.15 Verification checklist and next section
- Distinguish capabilities, outcomes, processes, services, roles and applications.
- State the selected service boundary and avoid implying enterprise completeness.
- Define each capability by a stable ability, not a technology product.
- Record accountable ownership separately from participation and technical support.
- Give value stages observable exit conditions and legitimate alternative endings.
- Map material capability contributions to the Section 03 outcomes.
- Define information and authority acceptance at important handoffs.
- Exercise interruption, correction, rejection and duplicate-submission scenarios.
- Preserve unknowns and evidence confidence in capability assessments.
- Sequence semantic and ownership decisions before implementing their technical form.
- Validate interpretations with actual participants and retain unresolved disagreement.
- Keep identifiers, source versions and revisions traceable.
Section 05, Institutional Operating Model, will explain how these responsibilities are organized and sustained: decision rights, service ownership, delivery and operational arrangements, escalation and capacity. It should use the capability and handoff records rather than deriving institutional responsibility from a technology diagram.